Projects

CLEAN AGENT / WET CHEM SUPP. SYSTEMS

Installation of FM200, NOVEC, CO2 and wet chemical automatic fire suppression systems.

Some Project References:

  • FM200 for Control Rm at Tuas Desal Plt
  • CO2 for Odour Treatment Plt at Kranji WTP
  • NOVEC for Data Rms at Mediapolis
  • NOVEC for Switch Rms at Kranji/Jurong WTP
  • Wet Chem for Foodcourts and Coffeeshops
WET & DRY RISER SYSTEMS

Installation of wet and dry riser systems, landing valves, standby fire hoses and breeching inlets.

Some Project References:

  • Backpack Hostel at King’s George Ave
  • Residential Devt at Purvis St
  • Concrete Batching Silo at Jurong Port
  • Chemical Plt at Jurong Island
  • Worker’s Dormitory at Joo Koon
FIRE HOSEREEL SYSTEMS

Installation of hosereels, hosereel tank and hosereel pumps.

Some Project References:

  • Dormitory at Joo Koon
  • Recyling Warehouse at Tuas Ave 2
  • Power Plt at Sakra, Jurong Island
  • Various Student care, Eldercare Centres
  • Backpack Hostels at Bugis/Beach Rd
FIRE SAFETY ILLUMINATION LIGHTS

Installation of fluorescent and LED exit and emergency lights.

Some Project References:

  • Restaurant at Syed Alwi Road
  • Retail Space at Clark Quay
  • PCF Kindergarten at Yishun
  • Training Institute at Third Lok Yang
  • PCF Kindergarten at Yishun
FIRE ALARM SYSTEMS

Installation of fire alarm panels,call points, alarm bells, strobe lights, heat and smoke detectors.

Some Project References:

  • HDB shop houses at Yishun & Stirling Rd
  • Backpack Hostel at Lavender St
  • Electrical Pump Room at Bartley Rd
  • Newwater Plt at Kranji WTP
  • Residential Units at Boat Quay
FIRE SPRINKLER SYSTEMS

Installation of sprinklers, sprinkler tank and sprinkler pumps.

Some Project References:

  • Warehouse at Tuas Ave 8
  • Student Hostel at NUS Extension
  • Retail Shops at Various Shopping Malls
  • Dry Sprinklers for ColdRms at Senoko Rd
  • Deluge Valve System at Jurong Island
FIRE HYDRANTS

Installation of fire hydrants, underground pipes and trenching works.

Some Project References:

  • Warehouse at Tuas Ave 10 and 12
  • Power Plt at Tembusu, Jurong Island
  • Office cum Warehouse at Loyang Dr
  • Warehouse at Tuas South Ave 2
  • Hotel at Scotts Rd/li>

ONE-WAY AND TWO-WAY EVACUATION COMMS SYSTEMS

Installation of one-way and two-way evacuation voice comms systems.

Some Project References:

  • Dormitory cum office at Tuas South Ave 5
  • Dormitory cum office at Tuas View Circuit
  • Backpack Hostel at Lavender St
  • Control Rm at Jurong WTP
  • Warehouse at Tuas South Ave 2
PERSONS WITH DISABILITY (PWD) AND SMOKE ASPIRATING SYSTEMS

Installation of PWD systems.

Some Project References:

  • Warehouse cum dormitory at Joo Koon Rd
  • Office, Warehse and Showrm at Eunos Ave 7
  • Commercial Bldg at Tai Seng St
  • Control Rm at Jurong WTP
  • Data Rms at Mediapolis